Concrete floor installation in Moses Lake WA - a floor that holds up to everyday wear
Old floor cracked, dusty or uneven? We plan the finishing, joints and curing so your new slab comes out hard, flat and ready to use.

- Fully licensed and insured.
- Free estimates at your property.
- We reply within 1 business day.
What does a new concrete floor involve, and what drives the price?
Concrete floor installation in Moses Lake means our crew places a new slab, then finishes it, cuts its joints and cures it, so you end up with a floor that stands up to wear and drains the way it was planned to. The pour itself is quick. Most of the waiting comes afterward, while the slab cures.
Most people who call about a floor have a shop, an outbuilding or a room where the old slab is cracked or dusty, or where there's no slab at all yet, and they want to know two things: what it'll cost and how long the space is out of use. The price moves with the floor's size and thickness, how much digging out and base work it needs, whether there's old concrete to tear out, and extras like a moisture barrier or insulation for a heated floor. The schedule turns on any permit, the prep work and the cure time before you load the floor up, and you get your own figure in a written estimate after I see the site. If it's the garage you're redoing, our garage floor concrete page covers that job.
How do you know your concrete floor needs replacing?
Cracks running across the floor
Long cracks that keep widening, or have one side sitting higher than the other, usually mean the base moved or the floor was never jointed. Left alone, they let water and grit in and the edges start chipping, so a crack you could have lived with turns into a slab you have to replace.
A dusty, powdery surface
If you can never sweep the floor clean because the top keeps rubbing off as gray powder, the surface was usually finished or cured wrong and it's weak. It won't get better on its own. It keeps shedding onto everything you store there, and coatings tend not to stick to it.
Flooring or coating coming loose
Tile popping, vinyl lifting or a coating that blisters often means moisture is coming up through the slab from the ground. Putting new flooring down won't fix that, so the money for the new covering goes the same way unless the slab underneath gets dealt with.
How we handle concrete floor installation
We start by digging out to firm ground and packing the subgrade, the dirt and gravel the slab sits on, because a base that's only raked level settles later and takes the floor down with it. Then we set forms, lay any moisture barrier and rebar, which is the steel that helps hold the slab together, and time the pour so we aren't finishing in the midday heat. Finishing, joint cuts and curing each have their moment on a floor, so I plan the whole pour around that timing. We trowel the top when it's ready for it, cut control joints, which are shallow lines that give the slab a place to crack where we chose, and then cure it, which means holding moisture in long enough for the concrete to gain its strength. If you plan to put flooring or a coating on top, tell us early so we can talk about the moisture barrier below the slab. The base is the part nobody sees on day one, and it's the first thing people want to cut from a budget. I won't cut it, because a nice finish on a bad base is still a bad floor.
A floor is often one piece of a bigger project. If the new slab steps down from a door, we can form and pour concrete steps on the same job so you're not stepping onto a stack of blocks. If a pool area is part of the plan, our concrete pool decks start with the same base work and get a finish that's made for wet bare feet.
Bare concrete working floor
This suits shops, storage rooms and utility spaces where the concrete is the finished surface. We put our attention on a hard, flat top that won't dust, with joints laid out around how you'll use the room.
Slab under flooring or a coating
This suits finished rooms and any floor that's getting tile, vinyl, wood or a coating. We plan the moisture barrier from the start, because what's under the slab decides how well the covering on top holds up.
Get a written scope for your new concrete floor
Send the form, and we'll get back to you within one business day to set a time for me to come look at the site. The estimate is free, done at your property, and there's no obligation to go ahead. You get the scope in writing, so you can compare it to any other bid.
(509) 512-0637Planning concrete floor installation in Moses Lake
Before I price a floor in Moses Lake, I check with the city or county office that covers your property. The City of Moses Lake requires a permit before any grading and clearing on a property, and its online portal takes building permit applications for new construction, remodels, additions and ADUs. Whether your floor needs a permit depends on what the project includes, and that's the city's decision. When a permit is needed, we handle the application or help you with yours, and we build to what the office decides. Grant County's design criteria also put the frost line at 18 inches, and that's the depth we work from for any footing that ties into the floor.
If you want a heated floor, state rules require at least R-10 insulation between the soil and the entire area of a heated slab that sits on the ground, so budget for insulation under the whole floor and not just the edges. We pour floors for shops, garages and outbuildings around Moses Lake, and we do the same work on jobs in Ephrata, Othello and other cities around the area.
What happens after you call about a new concrete floor?
Call or send a message
Call (509) 512-0637 or use the form, and we'll set up a time to look at the site. It helps if you know the floor's rough size and what it'll be used for.
Walk the job with me
I come out, mark out the floor and talk through your choices, including the moisture barrier and the permit side. You then get a written estimate with the full scope spelled out, so you can see exactly what you'd be paying for and line it up against other bids.
Prep, form and pour
Once you say go, our crew digs out and packs the base, sets the forms and pours, and I'm on site to run the pour. Finishing and joint cuts happen when the concrete is ready for them, which means the slab sets the schedule that day.
Learn how to care for it
Before we leave, I show you how to look after the new concrete while it cures. That's when a lot of floors get hurt, after the crew has gone home.
Frequently asked questions
How much does a new concrete floor cost in Moses Lake?
Your price comes from a written estimate after I see the site, because the floor's size, its thickness and the base work it needs change the number more than anything else. Tearing out an old slab, adding rebar, putting in a moisture barrier for flooring or insulating under a heated floor all add to the cost, and a simple floor with easy truck access keeps it down. We list each piece separately so you can see what's driving the total.
How long does a new concrete floor take before I can walk on it?
A new slab should be walkable within 48 hours, and waiting a week before you put heavier loads on it is the safe choice. Concrete takes a month to fully cure, so plan to move shelving, equipment or vehicles in around those dates, not the day after the pour.
Will my new concrete floor crack?
It can, because nobody can prevent cracks in concrete entirely, but properly designed joints control them and keep them to a minimum. Ask any contractor where the joints will go before the pour. When I lay out your floor, I'll show you where ours go and why.
Do I need a permit for a concrete floor in Moses Lake?
You may, and the city makes that call, not us. It depends on what your project includes, so I check with the office that covers your property before I price the job, as covered in the planning section above.
What goes under a concrete slab to keep moisture out?
A vapor retarder goes under the slab. It's a moisture barrier sheet, and it gives flooring and coatings the most protection when it sits in direct contact with the concrete. One industry guide says conventional polyethylene sheeting has been used in the past but shouldn't be considered for below-slab moisture protection, so ask any crew which barrier they plan to use. If you're putting flooring down, tell us before the pour and we'll go over the setup with you.
What is the best way to cure a new concrete floor?
One trade guide says curing should start as soon as finishing is done and last at least 3 days. It lists three ways to do it: covering the slab with wet burlap and plastic sheeting, using a liquid curing compound, or curing it with water. Before we leave, I'll tell you what your floor needs from you while it cures.
Moses Lake, WA
Tell us about the floor you need
Call (509) 512-0637, email sales@concretemoseslake.com or use the contact form with the floor's size, what it'll be used for and any flooring or heated floor plans, so the first visit covers all of it.